FCHC Annual Report 2012

Spotlight on Infrastructure

2012 MARKED A PERIOD of significant infrastructure improvement for FCHC properties. Among the improvements to Winter Hill and Virginia Village were:

•  a storm water management paver system installation •  terracing of flower beds to reduce erosion •  new energy efficient windows with improved emergency egress •  water-conserving toilets and shower heads •  kitchen and bathroom aerators •  energy-efficient air conditioner units with remote controls

•  safety grab bars in bathrooms and showers, and •  apartment floor lamps with energy efficient bulbs

3

Powered by